Owner Builder

The job required injection from 2 to 3m depths. The very rear of the block required a further 1.5m as it was retained out of the ground. 4m steel columns were installed in the ground to take the weight of the additional height of 1.5m.

 

Working closely with the earth workers, we achieved a successful result on a budget price.

 

 

 

 

WHERE

Mylup

 

Chemical Grout Injection RequireD

30LM ranging from 2m to 3m in depth

 